Tag Archives: house hunting

Monday’s Update (Late) on a Tuesday

This is getting to be a habit, isn’t it?

I’ve spent lots and lots of time adulting this week. Things just gotta get done, ya know? The craziness of preparing to move plus trying to find a new house plus getting this one ready to sell (we can’t find any handy people who want to bid our job!) plus keep up with all the normal stuff we need to do (for some crazy reason, my family still wants dinner. Every night!)

Take all that and add in a toddler who’s dropping naps (woe is me!) and it’s a struggle to get anything done.

I’ve instituted a daily quiet time for the toddler, which will allow me too get something done, and I’m using my MDO time to pack and sort through all our stuff. Which only leaves bedtime for knitting. The plus side is that we can put jellybean to bed early when he doesn’t nap and he usually doesn’t have an issue with that.

I’ve been focusing on my husband’s sweater for the last week or so. I’ve finished one sleeve and made good progress on the second. The pattern is easy and predictable, so after the first repeat, I didn’t need to look at the chart anymore.

image

Beginning first sleeve

This sweater is constructed differently than my cardigan. My cardigan was knit all in one piece with no seams. This sweater is knit with the front, back and sleeves being separate pieces.

image

First sleeve finished

Patterns always start with instructions for the back, then the front, then sleeves. I started with the sleeves, though. I do have a reason! The sleeves start out at the cuff, and are only 54 cast on stitches rather than 120-something. I used the first sleeve as a gauge swatch, so I sorta cheated. Turns out I hit the gauge right on the money so there was no need to rip out. Always a good thing.

When I started the second sleeve, though, I realized I forgot to change one of the needles after the cuff. (The ribbed cuffs are usually knit with a needle one or two sizes smaller than the body.) So I knitted the entire sleeve with an 8 on the wrong side and a 9 on the right side. Oops.

I’m not really sure if that will have a huge effect on the overall fabric, but just to be on the safe side, I forgot to do it again on the second sleeve.

I have a few stockings that are washed, blocked and ready for details and personalizing. Two are for the shop and the other two are claimed. One of these nights, I’ll take a break from the sweater and get them finished up.

I have plans to offer some luxurious lip butters and lotion bars in my shop this fall, too. My father-in-law keeps bees, so I have an awesome local source for untreated beeswax. I’m very excited about this!

Tomorrow we’ll be looking at more houses. Wish us luck that we find one we like! Have a great week!

P.S. I wrote this entire post on my phone, since I’ve been to busy to sit down at the computer. I hope the mistakes are few and forgivable. 🙂

2 Comments

Filed under Family, Knitting, Not Knitting